【1】Main Drainage System Project To Mitigate Flooding In The Mae Fah Luang Community Area, Phase 2, Mueang Chiang Rai District, Chiang Rai Province. (FPS-MFL2 6702CS)

【1】Main Drainage System Project To Mitigate Flooding In The Mae Fah Luang Community Area, Phase 2, Mueang Chiang Rai District, Chiang Rai Province. (FPS-MFL2 6702CS)

  • Location :

    Department of Public Works and Town & Country Planning

  • General Information :

    Comprising: 1. Drainage System, Including: Improvement Of The Lower Section Of Huai Mae Khaotom (Dr3) Km. 0+017 – 0+826, Improvement Of Canal Type 4, Length 809 M; Improvement Of Huai Plu (Dr4) Km. 0+000 – 0+460, Improvement Of Canal Type 1, Length 456 M; Km. 0+460 – 0+475, Improvement Of The Weir With Sluice Gate (Gr1), Length 15 M; And Improvement Of The Drainage Channel At Ban Huai Plu (Dr5) Km. 0+000 – 0+085, Improvement Of Canal Type 2Gor, Length 85 M; Km. 0+085 – 0+135, Improvement Of Canal Type 2b, Length 50 M. Km. 0+135 – 0+150: Canal Improvement (Type 2a), Length 15 M; Km. 0+150 – 0+195: Canal Improvement (Type 2b), Length 45 M; Km. 0+195 – 0+288: Canal Improvement (Type 2Gor), Length 93 M; Km. 0+288 – 0+294: Canal Improvement (Type 2b), Length 4 M; Km. 0+294 – 0+408: Canal Improvement (Type 2Gor), Length 114 M; Km. 0+408 – 0+411: Canal Improvement (Type 2b), Length 3 M; Km. 0+411 – 0+455: Canal Improvement (Type 2Gor), Length 44 M; Km. 0+455 – 0+540: Canal Improvement (Type 2b), Length 85 M; Km. 0+540 – 0+603: Canal Improvement (Type 2Gor), Length 63 M; Km. 0+603 – 0+937: 2.40x2.40 M Drainage Culvert (334 M); Km 0+937 – 0+980: 2.10 M Diameter Pipe Jacking Under The Road (Sp3) (43 M); Km 0+980 – 1+533: 2.40x2.40 M Drainage Culvert (553 M); Km 1+533 – 1+549: Highway Roadside Inlet Structure (Sp4) (16 M); Km 1+549 – 1+780: Canal Improvement Type 2Gor (231 M); Km 1+780 – 1+791: Manual Sluice Gate (Ga2) (11 M); And Km 1+791 – 1+799: Canal Improvement Type 2Gor (9 M). 2. The Hydraulic Structures Comprise: Br1 And Br2 (Improvement Of Two Bridges Crossing Huai Phlu Canal); Sp1 And Sp2 (Improvement Of Two Sections Of Huai Phlu At Ban Phlu Thong); Sp3 (One Road Culvert Crossing Highway No. 1); Sp4 (One Drainage Culvert Crossing Highway No. 1); Ga1 (Improvement Of One Weir On Huai Phlu At Huai Phlu Market); And Ga2 (One Sluice Gate For A Public Canal Connecting To Huai Mae Khao Tom).

  • Construction Cost :

    197.80 Million Baht

  • Owner :

    Department of Public Works and Town & Country Planning

  • Design by :

    Department of Public Works and Town & Country Planning

  • Construction by :

    TBS Joint Venture

  • Completion Date: :

    June 2026