Tha Khao Plueak Subdistrict, Mae Chan District, Chiang Rai Province.
Comprising 1) Bank Protection Embankment Works Embankment Crest Length: 2,538 Meters Crest Elevation: +96.100 Meters, Including Guardrails Embankment Face Construction: - Driving Of 0.26 X 0.26 X 5.00 M Reinforced Concrete Piles At 1.00 M Spacing, Placement And Compaction Of Saturated Sand Fill - Riprap Placement (Stone Size ≥ 0.35 M) At A 1:1.5 Slope, Extending To The Existing Ground - Riprap Crest Elevation: +91.20 Meters - Hand-Placed Stone Pitching (Stone Size 0.20–0.50 M) With Voids Tightly Filled With Smaller Stones; Slope 1:2.5, Extending To The Embankment Crest 2) Reinforced Concrete Road Works Construction Works Behind The Dam - Sidewalk Paving With Interlocking Concrete Blocks - Reinforced Concrete Curbs And Manholes With Drainage Pipes - Reinforced Concrete Road Behind The Dam (4.50 M Wide, 0.15 M Thick, 2,538 M Long) - 100W LED Lighting Units Mounted On 6-Meter-High Lighting Poles 3) Other Related Works - Drainage System In Front Of The Dam (0.60 M Diameter Pipe, 15.00 M Long) - Reinforced Concrete Stairs - Other Works To Ensure The Components Are Complete And Fulfill The Project Objectives
160 Million Baht
Department of Public Works and Town & Country Planning
Study And Design Group, Department Of Public Works And Town & Country Planning
S. Sirichai Co., Ltd.
21 May 2028